Project: BobCollins   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Bob Collins   -  
Project:   Vans - RV-12iS   -   VIEW REPORTS
Total Hours:1059
Total Expense:$101645.34
Start/Last Date:Jan 04, 2017 - No Finish Date
Engine:Rotax 912iS
Propeller:Sensenich
Panel:Dual screen G3X, autopilot
 
Friendly URL: https://eaabuilderslog.org?s=BobCollins

Home or Last Project Picture

Jul 19, 2020     Cut firesleeve - (.5 hour)       Category: Engine
It was about 105 degrees with the heat index so, no, I wasn't going to do much work at the hangar. I'd gone there just to drop off the power washer for storage. Then I remembered the old Ken Scott piece of advice: "touch the project everyday." Well, OK. So I cut two 4 1/2" lengths of firesleeve and then "bonded" (yeah, we'll see, this all seems kinda lame) the two together with black RTV adhesive. This is going to protect an area of the engine. I would've liked to have used red RTV (and I probably still will), but my old tube had hardened. Save your jokes.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.